Recycling 4-year-old 737 memes (Part 5)

370 points · 10 comments · view on lemmy.world

10 Comments

Chickenstalker@lemmy.world · 21 pts · 2y (2 replies)

The 737 design has reached its max (heh) potential. There's no more milk to squeeze out from this cow. Boeing has to bite the bullet and design a new plane from the ground up. Surely those billions in tax payer funded military contracts can be invested in R&D.

MataVatnik@lemmy.world · 9 pts · 2y

The execs already plundered and pocketed all of the money

Kase@lemmy.world · 5 pts · 2y

from the ground up

hehe :)

The_v@lemmy.world · 20 pts · 2y (2 replies)

4 years later around 150 new airplanes are still sitting on the tarmac as the crews fix around 6-7 per month.

It's pretty bizarre to drive past where they store/repair them in Moses Lake and see them all.

MataVatnik@lemmy.world · 3 pts · 2y (1 reply)

Didn't know, are they planes that never sold? Or were grounded? Or just don't have the resources to repair them?

The_v@lemmy.world · 4 pts · 2y

Mostly still grounded planes in need of repair.

There are a few planes that were ordered by Russia and Ukraine that can not be delivered due to the war. There are also a few planes that are unsold.

mustbe3to20signs@feddit.de · 12 pts · 2y (2 replies)

Not to be the Ackchyually guy here but producing aircrafts unfit for flying already emits a lot of greenhouse gases.

MataVatnik@lemmy.world · 13 pts · 2y

Fake news, these planes are made of renewable materials, such as cardboard and greed.

cactus@lemmynsfw.com · 12 pts · 2y

Not to be the ackshually akshually guy but it says "since march 2019"

Spur4383@lemmy.world · 7 pts · 2y

The greenest plane