
Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.


Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.

Decided to build out the ceiling next, so that I can start hanging pipes and belts from it.


Piping run out for the two main Heavy Oil Residue lines, one for Rubber, one for Plastic.
0 Comments
No comments yet.