BART Trains Shut Down Systemwide in San Francisco Bay Area

https://www.nytimes.com/2025/05/09/us/bart-train-shutdown.html?unlocked_article_code=1.GE8.nw58.fQGjE8ZfxLqJ

20 points · 2 comments · view on lemmy.world

2 Comments

aka@lemm.ee · 15 pts · 1y

Around 8 a.m., traffic estimates showed that it would take more than 50 minutes to drive from downtown Oakland to the Civic Center in San Francisco. A BART ride between the two locations usually takes about 15 minutes.

Shows just how important public transit is now, and in the future.

aka@lemm.ee · 8 pts · 1y

This is a gift link, so no New York Times paywall for you all.