Credit: Echo5550
::: spoiler Post text Wow, what a week for SLS! Every mission had a part moved or modified.
Artemis III:
The core has received its first RS-25, and its second is underway, along with one (or both) Center Center SRB segments stacked. The spacer also had its forward ring welded on.
Artemis IV:
Not a huge update, but the boat-tail was finally shipped to KSC to be mated with the engine section.
Artemis V:
Thanks to @ThePrimalDino, we can confirm that two (assuming one of the barrels is the already-confirmed one) exist for Artemis V, along with the forward skirt!
Artemis VI:
The core had its first ring welded together! Additionally, thanks to photos from @ThePrimalDino, Michoud has begun assembling the engine section, which appears to be half-welded, with parts lying nearby ready to be added, and it should be completed soon.
:::

0 Comments
No comments yet.