Developer fined for breaching conditions of bat licence

https://www.constructionenquirer.com/2023/10/09/developer-fined-for-breaching-conditions-of-bat-licence/

15 points · 3 comments · view on lemmy.world

3 Comments

GreyShuck@feddit.uk · 9 pts · 2y (1 reply)

Good to see that NE actually has the resources to take action in cases like this - they are massively under-resourced.

However, I wonder how much the cost of this to the developer - £14500 - most of which are court costs - is actually a deterrent. That is not a lot for many developments, and I can see that it would be tempting to simply write it off as an acceptable cost.

There was no mention of whether they developer was required, as a result of this judgement, to add the access tiles and replace the felt as the original licence required either.

Big_Twerp@feddit.uk · 1 pts · 2y

It looks like they might be made to replace the roof lining (otherwise they would be contravening their planning commitments) so that will cost them.

jonne@infosec.pub · 5 pts · 2y

Oi, you got a loicence for those bats?